References
Test standards development and validation
[A.1] »Requirement specifications for DVB-T receivers for use in Slovenia«, development of requirement specifications;
[A.2] »Test procedures for conformity assessment of DVB-T receivers for use in Slovenia«, specification development;
[A.3] »Validation of Test Specifications for SIP - ISUP Interworking for the Profile A and B (Q.1912.5)«, Engagement in ETSI Special Task Group for standard development;
[A.4] »Network Integration Testing (NIT) between SIP and ISDN, including validation«, Engagement in ETSI Special Task Group for standard development;
[A.5] »Test Specifications (ATS/PIXIT) for SIP - ISUP interworking for the Profile C«, Engagement in ETSI Special Task Group for standard development;
[A.6] »Test Specifications (ATS/PIXIT) for Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR) (DTS/TISPAN-06019-3)«, Engagement in ETSI Special Task Group for standard development;
[A.7] »Test Specifications (ATS/PIXIT) for Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) (DTS/TISPAN-06020-3)«, Engagement in ETSI Special Task Group for standard development;
[A.8] »Test Specifications (ATS/PIXIT) for Communication HOLD (DTS/TISPAN-06021-3)«, Engagement in ETSI Special Task Group for standard development;
[A.9] »Conformance Test Specifications for use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) in IMS core networks«, Engagement in ETSI Special Task Group for standard development;
[A.10] »Interoperability Test Specifications for IMS NNI interworking«, Engagement in ETSI Special Task Group for standard development;
[A.11] »Maintenance of the ATS Conformance Test Specifications for SIP-ISUP Interworking (TS 186 002-3)«, Engagement in ETSI Special Task Group for standard development;
[A.12] »Conformance Test Specifications for SIP-ISUP Interworking between the IP Multimedia (IM) Core Network (CN) subsystem and Circuit Switched (CS) networks (ES 283-027)«, Engagement in ETSI Special Task Group for standard development;
[A.13] »Conformance Test Specifications for IMS specific use of Session Initiation Protocol (SIP) and Session Description Protocol (SDP) including validation (DTS/TISPAN-06035-3)«, Engagement in ETSI Special Task Group for standard development;
[A.14] »Test Specifications (ATS/PIXIT) for Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP) (ETSI TS 186 009-3)«, Engagement in ETSI Special Task Group for standard development;
[A.15] »Test Specifications (ATS/PIXIT) for the IMS Supplementary Services: ACR-CB MCID CUG TIP/TIR TISPAN R2 / 3GPP R7 (ETSI TS 186 016-03, ETSI TS 186 017-03, ETSI TS 186 018-03)«, Engagement in ETSI Special Task Group for standard development;
[A.16] »Validation of Network integration tests for SIP - SIP calls based on TISPAN R2 and 3GPP R7«, Engagement in ETSI Special Task Group for standard development;
[A.17] »Test Specifications (ATS/PIXIT) for Automated Interoperability Testing (DTR-MTS-00116, ETSI TS 186 011-02)«, Engagement in ETSI Special Task Group for standard development;
[A.18] »Test Specifications (ATS/PIXIT) and Validation of Test Specifications for SIP - ISUP Interworking for the Profile C (Q.1912.5, ETSI TS 186 002-03, TS 186 002-05)«, Engagement in ETSI Special Task Group for standard development;
[A.19] »Test Specifications (TSS/TP) for Extension of IMS NNI interoperability test descriptions«, Engagement in ETSI Special Task Group for standard development;
[A.20] »Conformance Test Specifications for the IMS Supplementary Services: OIP/OIR, CH, CDIV, CW, CONF and MWI TISPAN R2 / 3GPP R8«, Engagement in ETSI Special Task Group for standard development;
[A.21] »Enhancement of Automated Interoperability Testing Framework in IMS core networks«, Engagement in ETSI Special Task Group for standard development;
[A.22] »Update of IMS NNI Test Specifications for 3GPP R9 RCS 3.0 and IMS&EPC«, Engagement in ETSI Special Task Group for standard development;
Workshops and Hosted events in the area of telecommunications
[B.1] »NGN Vision and Reality«, 18 – 19 May, 2006, Hotel Park, Bled, international workshop.
[B.2] »Strategies for NGN« 23-24 November, 2006, Golf Hotel, Bled, international workshop.
[B.3] »Next Generation Multimedia«, 14-15 May, 2007, Hotel Golf, Bled, international workshop.
[B.4] »ITU-T FG IPTV 4th meeting«, 7 – 11 May, 2007, Hotel Golf, Bled, international workshop.
[B.5] »Corporate Creativity and Ideas Management«, international workshop organized with prof. Dr. Robinson in prof. Dr. Schroeder, Massachusetts-Amherst, USA, 18. oktober 2007
[B.6] »Telecom Convergence«, 28-29 March, 2008, international workshop.
[B.7] »Business Communications and Networking«, 19-20 July, 2008, Hotel Golf, Bled, international workshop.
[B.8] »Tutorial on QoS and related topics covered by ETSI STQ«, 5 December, 2008, Hotel Golf, Bled, ETSI STQ hosted workshop.
[B.9] »TTCN3 user conference«, 7-9 June, 2011, Hotel Golf, Bled, international conference.
[B.10] »Perspektiva razvoja digitalne televizije«, 16 September, 2011, SIST, Ljubljana, Workshop within SEE.DIGI.TV project
Hosted test events
[C.1] »OMA’s 21st TestFest«, hosting of interoperability event for Open Mobile Allience, Bled, 8-16 November, 2007
[C.2] »2nd IMS Interoperability Plugtest«, 10-14 November, 2008, hosting of ETSI Plugtest interoperability event.
Projects
[D.1] »Development of the NGN and IMS Test strategy and test methods«, Telekom Slovenia, 2006-2010
[D.2] »Elaboration of the requirements for Type Approval Laboratory for electronic communication equipment«, Workshop organized in cooperation with TCRA and ITU-T, Dar-es-Salam, June 25-27, 2009
[D.3] »Conformance assessment for DVB-T receivers for Slovenian market«, 2009-2010
[D.4] »The Establishment of Type Approval testign Laboratory for Electronic Communication Equipment in Tanzania«, Feasibility study, 2010-2011
[D.5] »SEE-DIGI.TV: Southeastern Digital Television«, Technical Workpackage Leader in South East Europe Terrestrial Cooperation project, 2011-2013